Intel
2004 saw SSM being asked by L. Lynch & Company to take on tool hook-up work in the new Intel FAB 24/2 Project. This project was one of the most complex and quality-driven installations in Ireland.
SSM worked in all areas of FAB 24/2 including inside the clean-rooms and the clean-room plant rooms.
This project was worked on by a team of 15 men on 12 hour days, over a 5 month period. SSM worked to Intel's renowned safety standards at all times, and never failed to bring a tool-hook up in on time.
The range of installations were of:
- Stainless steel
- fully welded
- flanged
- plastic-coated
- slip-jointed
- Vacuum pipe
- fully welded
- flanged
- plastic-coated
- slip-jointed
- Galvanised pipe
- fully welded
- flanged
- plastic-coated
- slip-jointed
SSM also manufactued, supplied and installed blast-gate dampers, step-over guards and purpose-built housings to Intel's specs.