2004 saw SSM being asked by L. Lynch & Company to take on tool hook-up work in the new Intel FAB 24/2 Project. This project was one of the most complex and quality-driven installations in Ireland.

SSM worked in all areas of FAB 24/2 including inside the clean-rooms and the clean-room plant rooms.

This project was worked on by a team of 15 men on 12 hour days, over a 5 month period. SSM worked to Intel's renowned safety standards at all times, and never failed to bring a tool-hook up in on time.

The range of installations were of:

  • Stainless steel
    • fully welded
    • flanged
    • plastic-coated
    • slip-jointed
  • Vacuum pipe
    • fully welded
    • flanged
    • plastic-coated
    • slip-jointed
  • Galvanised pipe
    • fully welded
    • flanged
    • plastic-coated
    • slip-jointed

SSM also manufactued, supplied and installed blast-gate dampers, step-over guards and purpose-built housings to Intel's specs.