Dublin Airport Bay 6 Extension
SSM were contracted by T.E. Lynskey Mechanical Contractors in 1998 to supply and install the main plantroom and risers supply and extract air ducts on the new Bay 6 extension project.
The ductwork sizes were so large that SSM designed a system to manufacture ducts onsite in position by use of single panel installations.
All of the main ducts were reinforced internally as the ducts were built in position.
SSM had full-time riggers and qualified tradesmen onsite from day 1, and this project was finished on time to the highest standards.
In this project SSM again showed mechanical contractors its ability to think outside the box and come up with simple cost-efficient solutions to difficult installations.